UNIVERSITY OF NEWCASTLE - HV MASTER PLAN

EPA developed a High Voltage Master Plan with the aid of a load flow study. The plan satisfies all the opportunities and constraints imposed/introduced by the UON IFS and Ausgrid.

The plan explains the methodology and reasoning for the necessary infrastructure additions and upgrades to achieve the HVMP, and a suggested staging for the works. 

download.png

Newcastle Agri Terminal - Newcastle Port

EPA were performed all the HV Design and Doumentation for the new Newcastle Agri Terminal Private High Voltage Network.

Works included:

  • Design Documentation of the all the 11KV Substations
  • Design of the High Voltage reticulation
  • The Protection Study or the entire network
  • Earthing Studies for the entire network
  • High Voltage Safety Management plan
20141021_Australia-facility_article_main_image.jpg

Newcastle Institute for Energy and Resources (NIER)  - Substation HV Upgrades

EPA were involved in the upgrade of Substation at the NIER at the University of Newcastle.

Works included:

  • Design Documentation of the new 11KV Substation
  • The Protection Study
  • Earthing Study
  • High Voltage Safety Management plans
download-1.png

Midal Cable Manufacturing  Tomago - Private High Voltage Network

EPA were designers of the new Private High Voltage Network at Midal Cables Tomago.

Works included:

  • Design Documentation of the 2 new 11KV Substations and HV reticulation
  • The Protection Study
  • Earthing Study
  • High Voltage Safety Management plans
SetWidth530-Midal-Cables3.jpg

Garden Island  -  Australian Navy Base

EPA were engaged as part of a design team as part of major upgrade to Electrical Systems on the Garden Island base. Our main role in this project was providing independent budget costings for the HV designs.


UoN STUDENT ACCOMMODATION PRECINCT - PRIVATE HIGH VOLTAGE NETWORK

EPA were designers of the new Private High Voltage Network at the University on Newcastle Student Precinct.

Works Included:

  • Design and Documentation of the new Main Substation (Sub 10) for the Precinct
  • The Protection Study for the Main Substation
  • Th Earthing Study for the Main Substation
  • The Protection Study for the new student accommodation building Substations 20 & 21
  • Rectification Works associated with Substation 20 and 21 Auxiliary Power Supplies
  • HV Safety Management Plan for the Student Precinct.
gallery_slide.jpg

Phu Kham Copper-Gold  - Laos

EPA are engaged to private the gold mine with a site wide Arc Flash Analysis on their HV assets. 

This project is our largest yet online sale purely source through our online store, and is a testament to how we are disrupting the engineering consulting industry, and proving how a company can reach remote areas of the globe through our online store.

F4-PanAust-PK-admin.jpg